FAQ > Measure Date > What do I need to have done before my measure date?

Before we come out to measure, we require:

  • New Cabinets: All cabinets properly installed and prepped as if we would be installing
  • Existing Cabinets: All countertops, backsplash and sinks must be removed.
  • Sinks
    • All sinks MUST be on site.
    • If you are using a farm sink, it must be installed, but not plumbed.
  • Cooktops/Stoves/Ranges must be on site, and not installed.
  • Job Details Sheet must be signed and returned to us.
  • 50% deposit must be paid.

Last updated on October 26, 2012 by Debi